Project Portfolio

Hauling & Rigging

(click any image for a larger view)

Erecting a 40’ wide x 40’ tall field welded section of a 250 ton capacity clay storage bin.
Erecting a 40’ wide x 40’ tall field welded section of a 250 ton capacity clay storage bin.



Setting a wet scrubber vessel for a calcine kiln.
Setting a wet scrubber vessel for a calcine kiln.



Erecting a 70’ tall single walled exhaust stack.
Erecting a 70’ tall single walled exhaust stack.



Setting the upper casing of a baghouse filter.
Setting the upper casing of a baghouse filter.



Lifting a venturi reactor for installation in a flue gas scrubber system.
Lifting a venturi reactor for installation in a flue gas scrubber system.



Permit over-width and overweight load with our, company owned, 51 ton capacity RGN Trailer.
Permit over-width and overweight load with our, company owned, 51 ton capacity RGN Trailer.



Permit over-width, over-length and over-height load with our, company owned, stretch trailers up to 65’ long.
Permit over-width, over-length and over-height load with our, company owned, stretch trailers up to 65’ long.