(click any image for a larger
view)
101'
freestanding, double-walled,
double-breached exhaust stack at
a brick plant. Carbon
steel outside shell, stainless
steel inside liner and a tuned
mass vibration damper. |
|
|
Lifting
the base section of a 101'
freestanding exhaust stack which
was pre-assembled with test
ports, access caged ladder and
1/3 circumference testing
platform. |
|
|
Lifting
the base section of a 101'
freestanding exhaust stack which
was pre-assembled with test
ports, access caged ladder and
1/3 circumference testing
platform. |
|
|
Lifting
the base section of a 101'
freestanding exhaust stack which
was pre-assembled with test
ports, access caged ladder and
1/3 circumference testing
platform. |
|
|
Setting the base section of a
101' freestanding exhaust stack
at a 131' radius using a 500 ton
hydraulic truck crane as well
as a 125 ton truck crane for
tailing and man basket access. |
|
|
Setting
the top section of a 101'
freestanding exhaust stack at
131' radius. |
|
|
Tying
in the top section of a 101'
freestanding exhaust stack. |
|
|
Connecting the top and bottom
sections of a 101'
freestanding exhaust stack with
top expansion. |
|
|
Setting
the top section of a 101'
freestanding exhaust stack at
131' radius. |
|
|
Setting
the base section of a 101'
freestanding exhaust stack
through the roof of a building. |
|
|
Setting an exhaust stack base
section over its anchor bolts. |
|
|
The
base section of a 101' tall
freestanding, double-walled,
double breached exhaust stack
anchored into place. |
|
|
Breach and cone replacement
liners for two 120' double wall
exhaust stacks. |
|
|
Installing a
replacement liner breach and
cone section into one of two
120' tall exhaust stacks.
Each stack was refurbished while
erect utilizing a 131' tall man
lift for access as well as a 60
ton capacity hydraulic truck
crane for lifting. |
|
|
Installing a
replacement liner breach and
cone section into one of two
120' tall exhaust stacks.
Each stack was refurbished while
erect utilizing a 131' tall man
lift for access as well as a 60
ton capacity hydraulic truck
crane for lifting. |
|
|
Installing a
replacement liner breach and
cone section into one of two
120' tall exhaust stacks.
Each stack was refurbished while
erect utilizing a 131' tall man
lift for access as well as a 60
ton capacity hydraulic truck
crane for lifting. |
|
|
Installing a
replacement liner breach and
cone section into one of two
120' tall exhaust stacks.
Each stack was refurbished while
erect utilizing a 131' tall man
lift for access as well as a 60
ton capacity hydraulic truck
crane for lifting. |
|
|
Installing a
replacement liner breach and
cone section into one of two
120' tall exhaust stacks.
Each stack was refurbished while
erect utilizing a 131' tall man
lift for access as well as a 60
ton capacity hydraulic truck
crane for lifting. |
|
|
Electric powered Bolson Chair
utilized to access the inside
liner of two 120' tall exhaust
stacks in order to perform
repairs during a refurbishment
project. |
|
|
Electric powered Bolson Chair
utilized to access the inside
liner of two 120' tall exhaust
stacks in order to perform
repairs during a refurbishment
project. |
|
|
Existing
failed expansion joint and ID of
the outer shell of two 120'
exhaust stacks to be
refurbished. |
|
|
Existing
failed expansion joint and ID of
the outer shell of two 120'
exhaust stacks to be
refurbished. |
|
|
Existing
failed expansion joint and ID of
the outer shell of two 120'
exhaust stacks to be
refurbished. |
|
|
Failed
inside liner to be replaced on a
120' double-walled exhaust
stack. |
|
|
Refurbished ID of the outer
shell and new support structure
for the inside liner of one of
two 120' exhaust stacks. |
|
|
Setting
a new replacement stainless
steel inside liner, breach and
cone section into one of two
120' exhaust stacks which were
refurbished while standing. |
|
|
Two 120'
tall double walled exhaust
stacks after refurbishment. |
|
|
Removal
of a failed 130' tall
single-walled freestanding
exhaust stack. |
|
|
New replacement 60' long base
section of a 130' tall
freestanding double-wall
insulated exhaust stack. |
|
|
Lifting to vertical a 60' tall,
72" OD base section of a 130'
tall freestanding double-wall
insulated exhaust stack. |
|
|
Lifting
to vertical a 60' tall, 72" OD
base section of a 130' tall
freestanding double-wall
insulated exhaust stack. |
|
|
Setting
the new replacement base section
of a 130' tall freestanding
double wall exhaust stack. |
|
|
Lowering an exhaust stack base
section onto its anchor bolts. |
|
|
Lifting the top 70’ section of a
130’ tall freestanding double
wall exhaust stack. |
|
|
Lifting the
top 70’ section of a 130’ tall
freestanding double wall exhaust
stack. |
|
|
Base
to upper section tie in and
access platform of a 130’ tall
freestanding double wall exhaust
stack. |
|
|
Final tie in
and expansion joint of a
replacement 130’ tall
freestanding double wall exhaust
stack. |
|